22 December 2019
Anzene Charging Station – Energy Router
- Swapping charging station roller supplier
- Lock mechanism to be updated soon
22 December 2019
MVP Prototyping for battery pack, docking station to cloud database linkup & behind the work scene – ignoring exterior industrial design – Part 3
- Each data pin purpose is listed
- Updated time line for production:
2nd Jan 2020: Mold confirmation
5th Jan 2020: Mold discussion
8th Mar 2020: Small batch production with UL testing - Certification of Adaptor: UL(specific number has to ask when doing;3C ; CE ;
- Is Lock/ adaptor isolated when charging; YES

10 August 2019
Energy Router Illustration
- Energy Router Illustration Improved with Block in homes
2 August 2019
Energy Router Illustration
- Energy Router in homes & resorts
22 July 2019
Anzene Energy Router App Design
- Ads design


4 June 2019
Anzene Charging Station – Energy Router
Specification will be overhauled
Lead time has been proposed to July.
New functions to be added to the Energy Router
- Energy Data Center
- Primary
- DC (36v)-DC (36v) DC (36v)-AC (300w)-AC (3000w)-AC (5000w)
- 300w Bi-Directional DC-DC x6
- 3000w Bi-Directional PCS x1
- MPPT for Solar and Wind Turbine x1
- 5000w Bi-Directional AC/DC
- Secondary – main
- Bi-directional 220 ac Support
- 3-phase Bi-directional 380 ac Support
- Bi-directional EV charger – Hybrid car 10kwh (3*2 routers) & full electric 40-60kwh (3*2*6 routers)
- Secondary – top up
- Home Hardware Security System
- Home Web Security System
- Offline Communication Server
- Sensors: Temperature, PMI
- Well Being Awareness System
- AI Virtual-Home-Assistant
- Link to respective countries’ home emer numbers (example: 999/ 995)
- DC (36v)-DC (36v) DC (36v)-AC (300w)-AC (3000w)-AC (5000w)
- Primary
24 April 2019
MVP Prototyping for battery pack, docking station to cloud database linkup & behind the work scene – ignoring exterior industrial design – Part 2
- updated with mvp of batteries-energy block
- used design is old one
- it would only come with simple experience test of charging, taking it out & putting it back
- The size of the shell remains unchanged, the inner diameter is + 0.3, and insulating paint is used at the same time.
- There are four sets of testing tools, two of which are manufactured and two are delivered for production and backup.
- The upper and lower inner chamfers
- Front-end 1 mm frame, assembly positioning, waterproof, weekly drawings
- battery-cells jig improvement
- each external R angle must be consistent
- the USB cover and the outside must be the same color, using the same technology separately.
- ID designer will confirm the color on final product
- burrs must be removed
- wiring arrangement and hot plugging adopt electronic factory direct welding as fast plugging mode
- coordination of sim-cards
- determine the bottom magnet on the bottom of battery-energy block
- the same antenna or all enclosure antennas are used in the antenna scheme.
- the module unifies one specification screw
- Current top-bottom cover is like plastic is called glass-glossy-paint. The disadvantage is that it is easy to change color.
24 April 2019
Anzene Overall Ecosystem Footprint Illustration
Illustration updates.

9 March 2019
Nano Wind Turbines for Anzene Docking Station
- To change turbine design and work our system platform
- prices from 350-1000rmb
- As compared to the 1st one that cost around 3000 rmb
- the price is good to set up home energy generation system
28 January 2019
Anzene battery & docking station Design Illustration attempts
Illustration only


27 January 2019
Nano Wind Turbines for Anzene Docking Station
Currently, the conversion is reported to be 80% at 6 m/s^2. Much better than all the nano.